SPA-1 Influent Structure Replacement & Improvements | WWD Weekly Digest

Nov. 4, 2021
From confined space condition assessment to an extensive bypass with tight construction optimization, the SPA-1 Influent Project earned its Top Project status.

The multi-phase SPA-1 Influent Structure Replacement & Improvements project required high-risk confined space entry for condition assessments, rehabilitation needs beyond initial expectations, an extensive bypass solution and intricate construction optimization planning.

In this video interview, hear from ​​Rey Aldava, wastewater manager for City of Surprise; Frederick Tack, technical director with GHD; Greg Armey, CIP project manager for City of Surprise; and David Giannetto, principal at Felix and project manager about their experience working on the project. Hear how they overcame challenges during the design and construction phases, and about the team that made it all happen.

  • Owner: City of Surprise, Arizona
  • Designer: GHD Inc.
  • Contractor: Felix Construction Company

Timestamps

  • Intro: (0:00)
  • Scope & scale of the project: (0:52)
  • Size of the community and population impacted: (2:33)
  • Project delivery method used: (3:27)
  • Phase one condition assessment technology and findings: (4:28)
  • The extensive bypass and difficulties it presented: (7:40)
  • Impact on utility management and operators: (10:27)
  • How SmartCover technology reduced impact to operators: (11:09)
  • Construction optimization and tools to address it: (12:15)
  • Shoutouts: (14:14)

Additional Resources

Sign up for More Water & Wastes Digest Content

Connect with WWD on Social Media

Sponsored Recommendations

Benefits of Working with Prefabricated Electrical Conduit

Aug. 14, 2024
Learn how prefabrication of electrical conduit can mitigate risk, increase safety and consistency, and save money.

Chemical Plant Case Study

Aug. 14, 2024
Chemical Plant Gets a Fiberglass Conduit Upgrade

Electrical Conduit Cost Savings: A Must-Have Guide for Engineers & Contractors

Aug. 14, 2024
To help identify cost savings that don’t cut corners on quality, Champion Fiberglass developed a free resource for engineers and contractors.

Energy Efficient System Design for WWTPs

May 24, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.